01
Connect
Closets, risers, and horizontal runs planned so every drop lands where the building actually works.
Commercial infrastructure solutions
Fairlead Cabling builds the low-voltage layer of commercial buildings: structured cable, fiber, wireless, and the pathways that keep it serviceable for the life of the facility.
01
Closets, risers, and horizontal runs planned so every drop lands where the building actually works.
02
Installed to a drawing, labeled in the field, and tested before the ceiling closes.
03
Moves, adds, and the as-builts your facilities team will still be using years from now.
Scope
Category 6 and 6A horizontal, patch panels, and faceplates for offices, clinics, classrooms, and tenant floors.
Single-mode and multimode risers between MDF and IDF, terminated, tested, and documented.
Access-point cabling, mounting, and pathway so coverage is a design decision, not a ceiling surprise.
Ladder, basket, conduit, sleeves, racks, and grounding that leave room for the next tenant and the next decade.
Cable and rough-in for cameras, access control, and conference rooms, coordinated with the systems contractor.
Certification reports, labeling standards, and as-built drawings handed over with the keys to the closet.
Where it lives
The work is commercial: occupied floors, construction schedules, and owners who expect the cable plant to outlast the first fit-out.
Sequence
Walk the site. Count rooms, measure risers, and note what the ceiling and the schedule will actually allow.
A pathway plan, drop count, and closet layout you can price, permit, and hand to the other trades.
Pull, terminate, and dress the cable while the building is still open, coordinated with electrical and GC.
Test every link, label both ends, and leave drawings that match the rack, not last month’s bid set.
Start a project
A floor count, a rough drop count, and whether this is new construction or an occupied remodel is enough to schedule a walkthrough.